Intel(Dalian)FAB68 Project(F01P Package)英特尔(大连)F68生产厂房项目
08-22 12:59:43 浏览次数:370次 栏目:市政工程
标签:市政工程技术,市政工程施工方案,
Intel(Dalian)FAB68 Project(F01P Package)英特尔(大连)F68生产厂房项目,http://www.gong66.com
吊点点位/配件(M10/L=3000)方形调节器及其以下不含 Set
套 10080
Square adjustor of hanger and fittings, excl. L<2000
吊点点位/配件(M10/L=2000)方形调节器及其以下不含 Set
套 2200
4 Install cleanroom “C” channel system, include supply of all necessary associated hardware
安装洁净室“C”槽钢系统,包括供应所有必需五金
Installation of ceiling support
吊顶支架安装 ㎡ 28885
5 Iwww.gong66.comnstall cleanroom FFU system
安装洁净室FFU系统
Keel installation
FFU龙骨安装 ㎡ 30185
FFU installation
FFU安装 Ea
台 4713
Installation of blind plate
盲板安装 pcs 16415
6 Install cleanroom furniture
安装洁净室家具
7 Install cleanroom metal works, include supply of all necessary associated hardware
洁净室金属安装,包括供应五金
cat ladders (refer to drawing F68F300AK501)
爬梯 no 2
cat ladders (refer to drawing F68F300AK502)
爬梯 no 4
stairs (refer to drawing F68F300AK503)
楼梯 set&www.gong66.comnbsp;4
protective handrails along F30 3657mm catwalk, (3.6m long per unit) with 100mm high epoxy powder coated toeboard (refer to drawing F68F300AK111, F68G000AK511, F68F000AK301, F68F000AK304, F68F000AK305,
扶手,沿F30 3657mm通道, (3.6m长/个),100高挡板,有环氧粉末涂层
Protective handrails (min. 1050mm high,L=7.2m long) with 100mm high epoxy powder coated toeboard along FAB L40 return air shafts with necessary accessories (refer to drawing F68F400AK163)
扶手(至少1050mm高,L=7.2m长),100高有环氧粉末涂层的挡板,沿FAB L40回风井,有配件 set 20
8 Install plywood coverage on FAB L30 waffle tables and FAB L40 structural purlin, include supply of adhesive tape around four sides of plywood, PVC sheet below plywood in FAB L30 www.gong66.comwaffle tables
安装胶合板,FAB L30办公桌和FAB L40结构围檩,包括供应胶合板四边的胶带和FAB L30桌胶合板下的PVC板
PVC sheet protection, incl. single-side black/yellow adhesive tape
2mmPVC板保护/含单面黑黄胶带 ㎡ 10000
9 Supply and Install all necessary temporary structure during construction if required
施工期间供装临时结构
Temporary estimation (subject to actual operation)
临时估计(按实际所发生计算) 工 100
10 Provide labour for routine and transition cleaning works during construction, include supply of all necessary tools, materials and instruments to perform cleaning works except clean wipers, mops (will be provided by MWZ)
清洁工,包括供应工具、材料、仪表。吸尘器和拖把(MWZ供应)除外 ,Intel(Dalian)FAB68 Project(F01P Package)英特尔(大连)F68生产厂房项目
吊点点位/配件(M10/L=3000)方形调节器及其以下不含 Set
套 10080
Square adjustor of hanger and fittings, excl. L<2000
吊点点位/配件(M10/L=2000)方形调节器及其以下不含 Set
套 2200
4 Install cleanroom “C” channel system, include supply of all necessary associated hardware
安装洁净室“C”槽钢系统,包括供应所有必需五金
Installation of ceiling support
吊顶支架安装 ㎡ 28885
5 Iwww.gong66.comnstall cleanroom FFU system
安装洁净室FFU系统
Keel installation
FFU龙骨安装 ㎡ 30185
FFU installation
FFU安装 Ea
台 4713
Installation of blind plate
盲板安装 pcs 16415
6 Install cleanroom furniture
安装洁净室家具
7 Install cleanroom metal works, include supply of all necessary associated hardware
洁净室金属安装,包括供应五金
cat ladders (refer to drawing F68F300AK501)
爬梯 no 2
cat ladders (refer to drawing F68F300AK502)
爬梯 no 4
stairs (refer to drawing F68F300AK503)
楼梯 set&www.gong66.comnbsp;4
protective handrails along F30 3657mm catwalk, (3.6m long per unit) with 100mm high epoxy powder coated toeboard (refer to drawing F68F300AK111, F68G000AK511, F68F000AK301, F68F000AK304, F68F000AK305,
扶手,沿F30 3657mm通道, (3.6m长/个),100高挡板,有环氧粉末涂层
Protective handrails (min. 1050mm high,L=7.2m long) with 100mm high epoxy powder coated toeboard along FAB L40 return air shafts with necessary accessories (refer to drawing F68F400AK163)
扶手(至少1050mm高,L=7.2m长),100高有环氧粉末涂层的挡板,沿FAB L40回风井,有配件 set 20
8 Install plywood coverage on FAB L30 waffle tables and FAB L40 structural purlin, include supply of adhesive tape around four sides of plywood, PVC sheet below plywood in FAB L30 www.gong66.comwaffle tables
安装胶合板,FAB L30办公桌和FAB L40结构围檩,包括供应胶合板四边的胶带和FAB L30桌胶合板下的PVC板
PVC sheet protection, incl. single-side black/yellow adhesive tape
2mmPVC板保护/含单面黑黄胶带 ㎡ 10000
9 Supply and Install all necessary temporary structure during construction if required
施工期间供装临时结构
Temporary estimation (subject to actual operation)
临时估计(按实际所发生计算) 工 100
10 Provide labour for routine and transition cleaning works during construction, include supply of all necessary tools, materials and instruments to perform cleaning works except clean wipers, mops (will be provided by MWZ)
清洁工,包括供应工具、材料、仪表。吸尘器和拖把(MWZ供应)除外 ,Intel(Dalian)FAB68 Project(F01P Package)英特尔(大连)F68生产厂房项目
上一篇:重庆南岸体育中心钢筋施工方案
下一篇:道路土方回填技术交底
++《Intel(Dalian)FAB68 Project(F01P Package)英特尔(大连)F68生产厂房项目》相关文章
- › Intel(Dalian)FAB68 Project(F01P Package)英特尔(大连)F68...
- 在百度中搜索相关文章:Intel(Dalian)FAB68 Project(F01P Package)英特尔(大连)F68生产厂房项目
- tag: 暂无联系方式, 市政工程,市政工程技术,市政工程施工方案,工程资料 - 市政工程