北京地铁5号线下穿既有铁路的隧道施工
with the main control system.
Analyses on Use of Varying Refrigerant Volume System for Equipment
Room of Metro Station Huang Jianhui 33
The paper analyzes the problems of the environmental control system
at stations that have been in existence in the aspects of maintenance,
reliability and energy consumption for the construction of the Shenzhen
metro phase 1 and thus puts forth the idea of adopting the varying
refrigerant volume system for the extended construction and carries
out the contrasts and analyses for its adaptability and the economic
and technological indices.
Cut-and-CoverConstructionofNewSubwayStationthroughTunnel
of Existing Subway in Operation
Ma Suozhu, Chen Hao 38
The construction of Chongwenmen station (large-span cut-and cover
station) for Beijing subway line 5 through the tunnel of existing subway
in operation is domestically a premiere in China. With the repeated
proofing, tests and exploration as well as the engineering
practices, the station has been completed smoothly in the condition
that requirements for structure and the operation safety of the existing
lines are met.
Construction of Tunnel of Beijing Subway through Existing Railway
Kong Baode 41
The paper introduces the construction technologies of the metro
tunnel through the railway subgrade in the condition of sand and earth
strata in combination with the practical engineering example of the
tunnel in the section between Puhuangyu station and Tiantandongmen
station of Beijing subway line 5 through the Beijing-Shanhaiguan
railway.
ReinforcementTechnologiesofGroundSubsidenceforShieldDriving
Wang Xiaozhong 45
The article introduces the analyses on the causes of ground subsidence
appeared at the seaside in certain shield-driving section of the
Guangzhou metro and the technical measures of reinforcement, which
have accumulated experiences and lessons for the shield-driving
construction.
Construction of Urban Rail Transit and Environmental Protection
Ji Youping, Zhang Haiyan 48
Based on the analyses on the inter-related effect and the restrain of
the environment to the construction of the rail transit, the paper puts
forward the measures of environmental protection for the construction
of the rail transit in different stages.
因为时间有限站长未进行排版,请见谅。如需完全版,请到下载专题中下载。
www.gong66.com 源自中铁 放眼世界 打造交通工程第一资源站
www.gong66.com
业务QQ:10011189
上一篇:大量渗水、涌水隧道施工(一)
下一篇:双圆隧道设计施工初探
++《北京地铁5号线下穿既有铁路的隧道施工》相关文章
- › 摩托罗拉系统要服务北京地铁
- › 松下中标北京地铁照明项目,对废旧灯管全面回收
- › 西门子获北京地铁2.9亿订单 援助奥运线
- › 中仪招标公司再获北京地铁采购项目
- › 湘电股份中标北京地铁
- › 方大屏蔽门中标北京地铁五号线
- › 318辆北京地铁青岛造 南车四方股份公司再中标
- › 镇江大全集团中标北京地铁电气化项目
- › 摩托罗拉数字集群系统入驻北京地铁1、2号线
- › 西子奥的斯与北京地铁十号线携手共盼奥运
- › 北京地铁将装“武汉眼睛”
- › 中国通号中标北京地铁9号线通信和信号系统设计
- 在百度中搜索相关文章:北京地铁5号线下穿既有铁路的隧道施工
- tag: 暂无联系方式, 地铁遂道,工程设计,工程资料 - 地铁遂道